Project Completion, Road Construction, Time-Overun, Triple Constraints Theory

Abstract

Construction projects in Kenya continue to experience delays and there is no noted improvement in the completion of road construction projects in the recent past. This has been worsened by the fact that some projects are started for political reasons leading to poor planning and skewed resource allocation. Delays in project completion have continued to cost tax payers millions of shillings with no tangible solution on sight necessitating this review. Therefore, this review synthesizes studies on construction project delivery in Kenya, revealing persistent delays affecting 35–73% of projects with no improvement over time. It was guided by the triple constraints theory, systems theory, resource-based view theory and institutional theory.  Contractor-related factors such as cash flow constraints, poor scheduling, and inadequate site management are the dominant delay causes, followed by client factors which included delayed payments and bureaucracy. Consultant factors such as design deficiencies, slow responses, and external factors which include price escalations, weather, and wayleave disputes are other significant causes of delay in project delivery. A causal domino effect is identified whereby client payment delays trigger contractor liquidity crises and work stoppages. This review makes three important contributions: establishing delay persistence, mapping causal chains, and identifying critical research gaps such as the absence of project duration prediction models for Kenya and undetermined effects of site meetings, personnel capacity, and variations on delays. Based on this review, the following interventions are desirable: improved contractor vetting, assured client funding, enhanced supervision, and development of empirically validated duration prediction models tailored to Kenya.

Downloads

Download data is not yet available.

References

Almarri, K., & Gardiner, P. (2014). Application of resource-based view to project management research: Supporters and opponents. Procedia - Social and Behavioral Sciences, 119, 437-445. https://doi.org/10.1016/j.sbspro.2014.03.049

Al-Mamlook, R., Bzizi, M., Al-Kbisbeh, M., Ali, T., & Almajiri, E. (2020). Factors affecting labor productivity in the construction industry. American Journal of Environmental Science and Engineering, 4(2), 24-30. https://doi.org/10.11648/j.ajese.20200402.13

Asinza, K., Kanda, E. K., Muchelule, Y., & Mbithi, S. (2016). Influence of financial capacity and monitoring on project quality of housing construction in Nakuru County, Kenya. International Journal of Research in Management, Science & Technology, 4(3), 38-43.

Biesenthal, C., Clegg, S., Mahalingam, A., & Sankaran, S. (2018). Applying institutional theories to managing megaprojects. International Journal of Project Management, 36(1), 43-54. https://doi.org/10.1016/j.ijproman.2017.06.006

Bii, K. J., Muchelule, Y., & Masila, C. (2026). Project cost management practices and performance of road construction projects in Mombasa County, Kenya. International Journal of Innovation, Enterprise, and Social Sciences, 6(2), 308-324. https://scholarnestpublishers.com/index.php/IJIESS/article/view/79

Dobson, M. S. (2004). The triple constraints in project management. Berrett-Koehler Publishers.

Elia, G., Margherita, A., & Secundo, G. (2021). Project management canvas: A systems thinking framework to address project complexity. International Journal of Managing Projects in Business, 14(4), 809-835. https://doi.org/10.1108/IJMPB-04-2020-0128

Kanda, E. K., Muchelule, Y., & Mamadi, S. (2016). Factors influencing completion of water projects in Kakamega County, Kenya. International Journal of Research in Management, Science & Technology, 4(2), 1-5.

Kawera, F., & Datche, E. (2023). Factors affecting project performance of public construction projects in Mombasa County, Kenya. The Strategic Journal of Business & Change Management, 10(4), 601-619. https://doi.org/10.61426/sjbcm.v10i4.2777

Kitungo, K. K., & Musembi, A. K. (2024). Project planning practices and performance of Kenya Rural Roads Authority projects in Machakos County. International Journal of Social Sciences Management and Entrepreneurship, 8(2), 912-921.

Lukale, A. M. (2018). Determinants of cost overruns in rural roads infrastructure projects in Kenya [Master's thesis, Strathmore University].

Mogoa, A. M., & Muchelule, Y. (2023). Project schedule management on performance of construction projects in Mombasa County, Kenya. The Strategic Journal of Business & Change Management, 10(2), 582-603. https://doi.org/10.61426/sjbcm.v10i2.2624

Mugo, A., Asiligwa, B., Chabari, G. K., Githae, C. K., Kilongi, E., Muange, E., Makori, F. N., Koech, J., Wangunyu, P. W., Okumu, R., Wanganga, S., & Muthima, S. T. (2019). Factors influencing the timeliness in completion of national projects in Kenya: A case of Nairobi City County roads. Journal of International Business, Innovation and Strategic Management, 3(2), 58-80.

Munyoki, S. K. (2014). Factors influencing completion of construction projects: A case of construction projects in Nairobi, Kenya [Thesis, University of Nairobi].

Musyoka, L. M., Kikwatha, R. W., Kisimbii, J. M., & Ndung'u, A. W. (2025). Evaluator capacity and performance of highway construction projects in Kenya. International Journal of Professional Business Review, 10(4), Article e05413. https://doi.org/10.26668/businessreview/2025.v10i4.5413

Mwakajo, I. S., & Kidombo, H. J. (2017). Factors influencing project performance: A case of county road infrastructural projects in Manyatta Constituency, Embu County, Kenya. International Academic Journal of Information Sciences and Project Management, 2(2), 111-123.

Oburu, A. O. (2020). Effective project time management. International Academic Journal of Information Sciences and Project Management, 3(6), 47-55.

Oloo, D. D., Munala, G., & Wanyona, G. (2015). Variations in civil engineering construction projects in Kenya: Causes and effects. International Journal of Engineering Research & Technology, 4(2), 1124-1129. https://doi.org/10.17577/IJERTV4IS020836

Onenga, L. M., Miroga, J., & Otinga, H. N. (2020). Determinants of timely completion of road construction projects in Kakamega County, Kenya. The Strategic Journal of Business & Change Management, 7(2), 311-326. https://doi.org/10.61426/sjbcm.v7i2.1631

Samo, T. B., Shale, N. I., & Wairiuko, J. W. (2024). Cost management practices and performance of roads construction projects in Kenya. International Journal of Social Science and Humanities Research, 2(3), 31-45. https://doi.org/10.61108/ijsshr.v2i3.125

Sankaran, S., Killen, C. P., & Pitsis, A. (2023). How do project-oriented organizations enhance innovation? An institutional theory perspective. Frontiers of Engineering Management, 10(3), 427-438. https://doi.org/10.1007/s42524-023-0258-0

Saya, B., & Onyango, J. O. (2024). Project contractors' capacity and performance of road construction projects in Uasin Gishu County, Kenya. Journal of Entrepreneurship & Project Management, 8(6), 88-112. https://doi.org/10.53819/81018102t2424

Seboru, M. A. (2015). An investigation into factors causing delays in road construction projects in Kenya. American Journal of Civil Engineering, 3(3), 51-63. https://doi.org/10.11648/j.ajce.20150303.11

Talukhaba, A. A. (1999). An investigation into factors causing construction project delays in Kenya: Case study of high-rise building projects in Nairobi [Doctoral dissertation, University of Nairobi].

Thomas, H. R., & Ellis, R. D. (2002). The root causes of delays in highway construction [Paper submitted for presentation at the 82nd Annual Meeting of the Transportation Research Board, Washington, DC].

Velumani, P., Nampoothiri, N. V. N., & Urbański, M. (2021). A comparative study of models for the construction duration prediction in highway road projects of India. Sustainability, 13(8), Article 4552. https://doi.org/10.3390/su13084552

Wandiri, C., & James, R. (2020). Project management and performance of rural road construction projects in Machakos County, Kenya. European Scientific Journal, 16(19), 457-474. https://doi.org/10.19044/esj.2020.v16n19p457

Downloads

Published

2026-10-16

How to Cite

Cheserek, E. K., Khaemba, A., Waweru, S., Oyaro, J., & Kanda, E. K. (2026). Delivery of road construction projects in Kenya: A review of causes, trends, and research gaps. SCIENCE MUNDI, 6(2), 445–455. https://doi.org/10.51867/scimundi.6.2.36